Get in touch with Suzhou UDTECH Technology Co., Ltd. Company
Extrusion Output Planner
Extrusion Output Planner
A pieces-per-day headline is not comparable between two machines unless the cartridge length is attached to it. Enter seconds per piece at a stated length and this turns it into a practical planning number, with the standard deductions that a ceiling figure leaves out.
Line & Shift Configuration
Based on the specific cartridge length stated below.
Planning Notice
The gross figure is an arithmetic projection based on the cycle time, not a measured plant output. Ask any supplier, including us, for seconds per piece at a stated length rather than relying solely on a pieces-per-day headline.



